Warranty on new construction in Dubai: complete guide 2025

  • 29.05.2025
  • 399 Views

Warranty on New Construction in Dubai: Complete Guide 2025

Dubai's real estate landscape is renowned for its ambitious skyscrapers, luxury villas, and ever-evolving cityscape. As the emirate continues to attract both local and international investors, the question of the quality and longevity of newly constructed properties is more pertinent than ever. One of the fundamental protections for property owners and buyers in Dubai's thriving property market is the warranty on new construction. In this comprehensive 2025 guide, we will explore the legal foundations, practical application, and essential nuances of construction warranties in Dubai. Whether you’re a first-time homebuyer, an experienced investor, or a developer, understanding these warranties is crucial to safeguarding your investment.

Table of Contents


Introduction to Construction Warranties in Dubai

Dubai’s exponential urban growth over the past two decades has led to an unprecedented construction boom, with new residential, commercial, and mixed-use developments rising across the city. In this bustling environment, ensuring long-term quality and durability is paramount for both property buyers and the broader real estate ecosystem. A construction warranty, sometimes called a building or structural warranty, acts as a vital safety net for owners, assuring them that builders stand behind the quality and integrity of their work.

Construction warranties in Dubai serve several critical functions:

  • Protecting property owners and investors from defects or failures.
  • Holding developers and contractors accountable for workmanship and materials.
  • Encouraging higher construction standards and professionalism in the industry.
  • Fostering trust and confidence in the Dubai real estate market, domestically and internationally.

Understanding the nuances of these warranties is essential for every stakeholder in the construction and property sectors. In this guide, we demystify the regulatory background, the practical application, and the steps you can take to ensure you benefit fully from your new development project’s warranty provisions.

The construction warranty regime in Dubai is primarily governed by the wider legal framework in the United Arab Emirates (UAE), as well as Dubai-specific regulations developed to protect property buyers and ensure industry standards.

1. The UAE Civil Code

The cornerstone of warranty and liability in construction lies in the UAE Civil Code (Federal Law No. 5 of 1985), particularly in Articles 880–883. These articles govern “Decennial Liability,” which holds architects, engineers, and contractors jointly liable to compensate the owner for a period of ten years for the total or partial collapse of a building or fixed installation—even if the defect is a result of ground issues or construction flaws.

  • Article 880: Requires contractors and architects to guarantee the durability of the building for 10 years, unless the project was intended to last for less than 10 years or if the parties agree otherwise.
  • Article 881: Holds all persons involved in the design and construction process accountable for defects.
  • Article 882: Allows parties to agree to more rigorous terms, but not to shorten the liability period below 10 years.
  • Article 883: States that claims based on decennial liability must be brought within 3 years of the occurrence of the defect.

2. Dubai Land Department (DLD) Regulations

Complementing the Civil Code, the Dubai Land Department (DLD) and the Real Estate Regulatory Agency (RERA) provide guidelines for developer-buyer relationships, including mandatory handover procedures and requirements for maintenance and warranties. These requirements are especially prominent in off-plan (pre-construction) sales, where buyer protection is prioritized.

3. Dubai Municipality and Building Codes

Dubai Municipality (DM) enforces a wide range of building codes and quality standards applicable to all new construction activity. The DM also plays a significant role in addressing building defects, ensuring construction quality, and verifying developer compliance.

Types of New Construction Warranties in Dubai

In Dubai, multiple types of warranties apply to newly constructed homes, villas, and buildings. It is crucial for buyers to distinguish between these warranties, as each covers different aspects of construction quality and has its own duration and terms.

1. Decennial Structural Warranty (10-Year Warranty)

The decennial (meaning “ten years”) warranty is the most significant statutory protection, rooted in the UAE Civil Code. It covers:

  • Structural integrity of the building – Protection against serious defects or total/partial collapse due to faulty design, engineering, or construction works.
  • Foundations and main structural elements – Includes load-bearing walls, columns, beams, slabs, and overall stability.
  • Major construction failures – Such as ground settlement, undetected subsurface issues, or systemic design flaws.

This warranty is compulsory, non-waivable, and automatically applies to all new construction projects.

2. Defects Liability Period (DLP) or One-Year Maintenance Warranty

Distinct from the decennial warranty, the Defects Liability Period (often called a maintenance warranty) covers:

  • Non-structural defects and workmanship issues – Covering everything from paint peeling, tiling defects, to window and plumbing leaks.
  • Electrical and mechanical systems (excluding major structural systems).
  • Fittings, fixtures, and finishings – Banisters, doors, cabinetry, etc.

The standard DLP in Dubai is 12 months from handover. During this period, the developer is liable to rectify any defects reported by the buyer.

3. Manufacturer Warranties

Beyond statutory warranties, certain individual components (such as elevators, air conditioning units, or appliances) often come with dedicated manufacturer warranties. The terms, duration, and scope of these warranties depend on the supplier or manufacturer, not the contractor or developer.

Warranty Duration and Coverage Details

1. The 10-Year Decennial Warranty Explained

The decade-long protection against structural defects makes the decennial warranty one of the most robust legal frameworks worldwide. Its main features are:

  • Coverage Begins: The warranty period begins from the date the completion certificate or building handover is issued by the relevant authority (e.g., Dubai Municipality).
  • Scope: Focuses strictly on “structural integrity” – major load-bearing elements, foundation, core slabs, columns, roofs, and similar elements.
  • What it Doesn’t Cover: Routine maintenance, cosmetic issues, defects related to owner misuse or natural wear and tear, or any third-party modifications after handover.
  • Transferability: The decennial warranty attaches to the property, not the original buyer; it automatically transfers to subsequent owners within the 10-year period.

2. The 1-Year Defects Liability Period (DLP)

The DLP (sometimes called a “snagging” or “rectification period”) is shorter and more comprehensive in its coverage of smaller, non-structural issues. Features include:

  • Coverage Starts: From the official handover/completion date.
  • Scope: All minor workmanship faults, poor quality installations, problems in mechanical, electrical, and plumbing systems, defective doors, windows, tiles, etc.
  • Reporting: Owners must report defects to the developer/contractor in writing, usually via an officially designated process.
  • Rectification: The liable party must remedy genuine defects, generally at no additional cost to the owner, within a reasonable period.

3. Extended and Manufacturer Warranties

Developers may offer extended warranties on specific elements (such as waterproofing or roof membranes), but these are not mandated by law. Manufacturer warranties on equipment or appliances must be separately claimed from the manufacturer or their authorized service agents.

Warranty Exclusions and Limitations

While Dubai’s legal framework provides strong buyer protection, it is essential for owners and investors to understand the boundaries of their warranty coverage. Some common exclusions and limitations include:

  • Wear and Tear:

    Routine deterioration of materials, components, or systems resulting from normal everyday use (e.g., fading paint, worn-out flooring) is not covered.

  • Incorrect Use or Negligence:

    Defects or damage arising from owner misuse, neglect, overloading, or unauthorized alterations void the warranty for the affected component.

  • Force Majeure:

    Events such as floods, earthquakes, acts of war, or natural disasters may be excluded, unless the defect is proven to be a construction or design failure.

  • Unapproved Modifications:

    Any changes, additions, or repairs carried out by unauthorized third parties after handover are not covered by the original developer’s warranty.

  • Manufacturer Liability:

    Separate warranties must be claimed for specific appliances or systems, as the building contractor is not the principal warrantor for those items.

  • Notifying within Period:

    If defects are not reported within the warranty/defects liability period, the developer’s liability lapses unless the defect is structural and falls under the decennial warranty.

Roles and Responsibilities of Developers, Contractors, and Owners

Effective warranty implementation relies on the clear demarcation of responsibilities among all stakeholders in the construction, purchase, and ownership process. Here’s what each party is accountable for:

Developer Responsibilities

  • Ensuring compliance with all legal and regulatory requirements related to building construction and finishes.
  • Providing the buyer/owner with clear written details of all applicable warranties at handover.
  • Timely rectification of any defects reported during the DLP.
  • Maintaining insurance policies (such as decennial liability insurance) where required.
  • Acting as the liaison between the owner and contractors for all warranty-related issues.

Contractor/Builder Responsibilities

  • Executing construction works in strict accordance with approved designs and building codes.
  • Assuming joint liability with consultants for decennial warranty claims regarding structural defects.
  • Remedying any confirmed construction defects during the DLP in coordination with the developer.
  • Supplying documentation for manufacturer warranties on equipment and systems.

Owner/Buyer Responsibilities

  • Carrying out a thorough snag inspection before and after handover.
  • Promptly reporting defects in writing to the developer within the DLP or warranty period.
  • Properly maintaining the property—following operation and maintenance guidelines.
  • Not making unauthorized modifications or repairs that could invalidate warranties.
  • Transferring warranty documents to new owners if selling within the coverage period.

How to Claim a Construction Warranty in Dubai

Ensuring you get the most from your warranty protection requires following the correct steps when reporting defects or requesting repairs. Here’s a step-by-step guide:

  1. Document the Defect:

    Take clear photographs or videos of the defect or issue. Gather related documents, such as the completion certificate, handover papers, and any correspondence with the developer or builder.

  2. Notify the Developer/Builder:

    Submit a written report (usually an official form or email) describing the defect in detail, supported by your documentation. Include the unit number, property address, and the handover date.

  3. Site Inspection:

    The developer or their maintenance contractor should arrange a site inspection to verify the reported defect. This step may involve consultants or engineers for structural claims.

  4. Rectification Works:

    If a genuine defect is confirmed within the warranty scope, the developer is obliged to rectify the issue at no cost to the owner. A reasonable timeline for repairs should be set.

  5. Completion and Sign-Off:

    Once the rectification is complete, the owner should inspect and confirm the repair. Documentation should reflect satisfactory closure of the claim.

  6. Escalation:

    If the developer fails to act or resolve the defect within a reasonable period, escalate the case to the DLD, RERA, or a qualified legal counsel for formal dispute resolution.

Developer Practices and DLD Requirements

As of 2025, the Dubai Land Department (DLD) and the Real Estate Regulatory Agency (RERA) have implemented strict requirements for developers, aiming at maximizing buyer protection and market transparency.

  • Mandatory Provision of Warranty Certificates:

    Developers must provide written warranty statements at the time of handover, detailing the coverage, period, and claim procedures.

  • Escrow Accounts:

    For off-plan developments, DLD requires developers to maintain escrow accounts, ensuring that funds for defect rectification and warranty obligations are ring-fenced and available post-handover.

  • Clear Communication Channels:

    Developers or their facility management arms must have publicly listed channels (hotline, email, customer portal) for owners to report defects and track resolution.

  • DLD Oversight:

    Persistent non-compliance by developers can result in penalties, restrictions, or blacklisting by the authorities.

Warranty, Snags, and Post-Handover Processes

The journey from property completion to the expiry of warranties involves several key steps and milestones. Here’s what buyers should expect:

1. Snagging Inspection

Before or at handover, buyers conduct a snagging inspection (often with a professional snagging company or engineer) to document any visible defects or poor workmanship in finishing, fittings, and systems.

  • Snagging Report: This formal, itemized list is submitted to the developer, who must rectify all listed snags generally before or shortly after occupancy.
  • Re-Inspection: A second inspection may ensure all issues are remedied.

2. Taking Handover

Upon satisfactory inspection and documentation, the buyer completes the handover process, obtains keys and access, and the DLP and decennial warranty periods formally commence.

3. Routine Maintenance and Reporting

Within the DLP, owners should keep up with routine maintenance and promptly report any defects. Maintenance logs can be helpful if warranty disputes arise.

Transferability of Warranties: Selling or Buying a Property

Dubai’s construction warranty laws make it clear that the warranties attach to the property, not the person. This has profound implications for the property market:

  • New Buyers are Protected: If a property is sold two years after completion, the new owner enjoys the remainder of the 10-year structural warranty and, if still valid, the remainder of the defects liability period.
  • Proof of Warranty: Ensure that warranty certificates, maintenance records, and defect rectification documents are passed to the new owner at the time of transfer.
  • DLD Transfer Process: The Dubai Land Department records the date of completion and handover, tracking the eligibility of current and future owners for warranty protection.

Choosing a Reputable Developer for Better Warranty Protection

While statutory warranties theoretically apply to all projects, practical experience shows that developer reputation is critical when it comes to smooth defect rectification and after-sales support.

  • Track Record: Research the developer’s history for timely delivery, quality construction, and responsiveness to defect rectification claims.
  • Customer Service: Top-tier developers often have dedicated after-sales departments, customer portals, and maintenance teams.
  • Third-party Accreditation: Awards or ISO certifications are indicators of quality processes.
  • References and Reviews: Speak to existing owners in older projects to gauge their warranty claim experience.

Dispute Resolution: What if the Warranty is not Honored?

If a developer or contractor fails to honor their warranty obligations, you have several escalation pathways:

  1. Internal Complaint:

    File a formal complaint through the developer’s established channels, keeping records of all correspondence and evidence of defects.

  2. DLD/RERA Involvement:

    Report the issue to the Dubai Land Department or Real Estate Regulatory Agency. They can mediate or direct the developer to comply, sometimes issuing penalties for non-compliance.

  3. Legal Action:

    For serious or unresolved claims, owners can seek recourse through Dubai’s courts, invoking the decennial liability provisions or contractual clauses.

  4. Expert Assessments:

    The court may appoint independent engineering consultants to assess the nature and cause of defects.

  5. Compensation:

    If successful, owners may be entitled to full repair of defects, damages, or (in rare cases) financial compensation for losses.

With the Dubai property market continuously evolving, several trends are shaping the future landscape of construction warranties:

1. Increased Regulator Oversight

DLD and RERA are raising requirements for post-handover support, aiming to streamline the defect reporting and rectification process and penalize non-compliant developers more effectively.

2. Integration of Technology

Smart property management platforms and digital handover apps now allow owners to log and track defects, monitor repair progress, and access warranty documentation in real time.

3. Insurance Products

More developers are availing decennial liability insurance from leading global insurers, providing added peace of mind and a neutral party for large warranty claims.

4. Extended and Custom Warranties

Premium developers are increasingly offering extended warranties (beyond the DLP) on waterproofing, facades, and MEP systems as a sales differentiator.

5. Sustainability Standards

As “green buildings” and LEED certifications become the norm, new warranty provisions are being introduced to guarantee the performance of eco-friendly features, such as solar panels, grey water systems, and advanced insulation.

6. Standardization and Transparency

Better standardization of warranty documents and clearer communications are helping owners and buyers make more informed decisions and reducing the risk of conflict.

FAQs: Construction Warranties in Dubai

Q1: Is the 10-year structural warranty mandatory in Dubai?
Yes, the 10-year warranty (decennial liability) is mandated by the UAE Civil Code and cannot be reduced or excluded by contract. Both contractors and consultants share this liability.
Q2: What is covered under the 1-year defects liability period?
The first year after handover covers most non-structural defects, such as poor workmanship, leaking pipes, faulty electrical points, doors, windows, and finishes.
Q3: How can I report faults during the warranty periods?
You should report faults in writing to the developer/maintenance company, using their official channels, and keep a record of your submissions and their responses.
Q4: Are warranties transferable if I sell my property?
Yes, warranties attach to the property. The new owner automatically enjoys the balance of the warranty period after purchase.
Q5: What if my developer refuses to repair a defect?
If the defect falls within the warranty, escalate to DLD/RERA or pursue legal action to enforce your rights. Gather supporting documentation and expert opinions as evidence.
Q6: Does the decennial warranty cover fixtures and appliances?
No, it covers only the structural elements. Appliances and certain systems are covered by their own manufacturer warranties, which vary in duration and procedure.
Q7: What is the role of the Dubai Municipality in construction defects?
DM sets and enforces building codes and may investigate major building safety or compliance issues in new developments.
Q8: Do off-plan buyers have the same warranty protection?
Yes, once the property is completed and handed over, all buyers are equally covered by the DLP and decennial warranty from completion.
Q9: What documents should I receive at handover?
You should receive the completion certificate, detailed snagging report, warranty statement, maintenance manuals, and individual manufacturer warranty certificates for key equipment.
Q10: How can I maximize my warranty protection?
Snag thoroughly at handover, maintain high-quality documentation, report defects quickly, and only use authorized repair and maintenance services.

Conclusion

Navigating the Dubai new construction market in 2025 requires more than a keen eye for architectural beauty or investment trends—it demands a thorough understanding of your future property’s warranty protections. The warranty system in Dubai is comprehensive, internationally benchmarked, and designed to foster confidence in buyers and developers alike. By understanding the structure, scope, and limitations of construction warranties—and by working with trusted developers and consultants—you can ensure lasting value and peace of mind for your property investment.

Whether you’re a homeowner eager to protect your family’s residence, a seasoned investor seeking durable assets, or a developer building Dubai’s future skyline, make warranty education central to your property journey. The strength of your legal and financial protections lies in the foundations—literally—of Dubai’s real estate warranties.

For the most current updates, guidance on specific projects, or legal assistance with a warranty claim, always consult Dubai Land Department resources or a local real estate legal expert. Empower your next property move with knowledge, due diligence, and a clear understanding of your construction warranty rights in Dubai.